CONCRETE & MASONRY

Concrete Calculator

Plan a slab, patio, driveway or pad from finished dimensions. The result includes a user-controlled waste allowance and whole 60 lb bag estimate.

FREEPrivate
by design
Inputs stay on this device
01

Enter project measurements

Live estimate
02

Planning estimate

Estimated order1.63 yd³
Cubic yards1.63 yd³
Cubic feet44 ft³
Cubic meters1.25 m³
Approximate weight3.19 tons
60 lb bags98
Estimated material cost$236.30
Planning note

Results use your measurements and editable assumptions. Verify product coverage, density, waste and order rounding with the supplier before purchasing.

FORMULA

How this estimate works

Volume = length × width × depth. Cubic yards = cubic feet ÷ 27.

BuildCalc converts measurements to a consistent internal unit, applies your project geometry and only then adds the selected waste allowance. Packaging quantities are rounded up because partial bags, blocks or boxes usually cannot be ordered.

BEFORE YOU ORDER

Field notes

  • Measure the finished dimensions, not the excavation alone.
  • Use the supplier's stated bag yield for final ordering.
  • Large pours are usually ordered as ready-mix rather than individual bags.
PRACTICAL GUIDE

How to plan with this concrete calculator

Use this calculator when the pour can be represented as one or more rectangular sections. Measure the finished length and width, enter the specified concrete thickness, and calculate separate sections for steps, thickened edges or grade beams. The waste control is applied after the geometric volume so you can see the base quantity before adding an allowance.

WORKED EXAMPLE

Example: a 12 × 20 ft patio

A 12 ft by 20 ft slab at 4 in thick contains 80 cubic feet, or about 2.96 cubic yards, before waste. With a 10% allowance, the planning quantity is about 3.26 cubic yards. A ready-mix supplier may round that amount or apply a minimum order.

USE THIS TOOL FOR

Good planning fits

  • Rectangular slabs, patios and equipment pads
  • Preliminary ready-mix quantity and cost comparisons
  • Checking how thickness or waste changes an order
COMMON QUESTIONS

Concrete Calculator FAQ

How many cubic feet are in one cubic yard of concrete?

One cubic yard contains 27 cubic feet. Divide cubic feet by 27 to convert the geometric volume to cubic yards.

Does the concrete estimate include a sub-base or reinforcement?

No. It estimates concrete volume only. Gravel base, reinforcement, forms, labor, delivery charges and structural requirements must be planned separately.

Published and maintained by EasyTool.me. Review the calculation methodology, verify product-specific values with the supplier, and report reproducible corrections. Last materially reviewed August 16, 2026.